PROJECT OVERVIEW:
The Project involves the construction cast-in-situ nonstandard profile of Single Side Kerb and Double Side Median Elsholz, modification of catchment pits, installation of new stormwater pipes and pits, subsoil drainage, footpath, Kerb & Gutter work, milling and re-sheeting with high friction asphalt, line marking, and landscape works.
PROJECT SCOPE:
Construct and pour 270 linear meters of Elsholz Kerb using a modified precast mold.
Modify catchment pits and install new stormwater pipes and pits.
Perform subsoil drainage, footpath, and Kerb and Gutter work.
Mill and resheet the area with high-friction asphalt.
Apply line marking.
Conduct landscape works