Provision of Single Side and Double Side Elsholz Kerb, Victoria Road- DM Roads

status

Status

Completed

client

Client

DM Roads

location

Location

RYDE, NSW

PROJECT OVERVIEW:

The Project involves the construction cast-in-situ nonstandard profile of Single Side Kerb and Double Side Median Elsholz, modification of catchment pits, installation of new stormwater pipes and pits, subsoil drainage, footpath, Kerb & Gutter work, milling and re-sheeting with high friction asphalt, line marking, and landscape works.

PROJECT SCOPE:

  • Construct and pour 270 linear meters of Elsholz Kerb using a modified precast mold.
  • Modify catchment pits and install new stormwater pipes and pits.
  • Perform subsoil drainage, footpath, and Kerb and Gutter work.
  • Mill and resheet the area with high-friction asphalt.
  • Apply line marking. Conduct landscape works