Main Heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Client
Service Stream
Status
Completed
Location
Near Selwyn Snow Resort, Kings Cross Road Kosciuszko National Park, NSW, 2629
Project Category
Telecommunications Infrastructure
Capability
Foundation Construction for Critical Structures, Specialised Rock Anchoring; High-Risk Asset Protection; Remote Alpine Logistics and Mobilisation
Tower Foundation and Strengthening
Construction of reinforced concrete lattice tower foundations to accommodate the installation of a 20m high lattice tower.
Concrete Foundations
- Construction of multiple reinforced concrete equipment shelter pads
- Construction of Stair support pads
- Construction of Cable ladder foundations
Rock Anchoring Works
Drilling and Installation of 6m deep rock anchors into unweathered high-strength geology to ensure permanent site geo-stability.
Site Power & Earthing Works
Installation of a new underground TAUE submain and pit system to upgrade site power distribution and earthing networks.
Security & Compound Works
Installation of 2.7m high chain-link security fencing, weed matting, and 75mm crushed stone compound base.
Remote Alpine Environment
The Constraint
Executing civil works at 1,600m altitude within Kosciuszko National Park during heavy snowfall and sub-zero conditions.
The WBS Solution
Managed specialized mobilization for 4WD-only access zones and daily coordination with resort logistics to maintain 100% schedule continuity.
Live Asset Vulnerability
The Constraint
High-risk proximity to active Telstra fiber lines, existing earthing systems, and live telecommunication towers.
The WBS Solution
Deployed Non-Destructive Digging (NDD) to vacuum-excavate and protect underground facilities, achieving zero service disruption.
High-Strength Geological Barriers
The Constraint
Subsurface discovery of unweathered high-strength rock that resisted standard excavation and fencing methods.
The WBS Solution
Utilized specialized high-torque drilling rigs to achieve 6m deep rock anchoring and precise post-penetration into the rock profile.
Design-to-Site Discrepancies
The Constraint
Critical inconsistencies identified between original IFC (Issued for Construction) drawings and actual site topography
The WBS Solution
Proactive technical management and rapid design resolution, allowing for the successful construction activities without any delays.
High-Sensitivity Environmental Compliance
The Constraint
Executing heavy civil works within a National Park (NPWS) zone, requiring 100% adherence to strict environmental preservation protocols.
The WBS Solution
Implemented high-visibility barricading and exclusion zones to secure existing rock features and natural habitats, ensuring all protected features remained entirely undisturbed throughout the project lifecycle.